Clean Up, Siding Finished & 2nd Porch Started

11/26/2011 Today we cleaned up after the electric guys and while we were sweeping up a guy came and finished off the overhead siding on the main porch and the few strips of siding that we were short on the back of the house. Gerry (The Builder) came out and checked out the electrical work and did some more work on the 2nd front porch. 11/28/2011 we have a electrical rough in inspection and then the insulation and sheet rock  can begin.

Main Porch now just about done. It only needs paint.

Overhead Siding was completed 
2nd Porch was worked on

All the siding is up

It's looking like we will be very close to getting in our home at Christmas. We have our fingers crossed.