The Front Porch and Gutters Where Worked On Today + Electric Rough In Almost Done

11/19/2011 The front porch received some love (only trim work to go now), the back porch got the main framework up last week, and the In-Law-Suite porch hasn't been started yet. The Gutters where all installed today. 11/17/2011 -11/18/2011 The electric rough in was almost finished. Upstairs is done, downstairs seams to only lack a few details, and all the outside outlets, lights, and my sub panel need to be done. After the electrical rough in comes the Ethernet lines and speaker lines.
Front Porch almost done
Back Porch Framed Up


Gutters 
Closer Look at the Gutters
Closer Look at the Gutters

Light Fixtures in Place

Lines for the Bar and Island Ran

Kitchen Pot Lights In Place

Lines Ran to the Panel 
Upstairs All Done


Main Line Ran