12/16/2011 The trim and doors were delivered and the septic field was prepped.
Kitchen |
Kitchen |
Kitchen |
Close up of kitchen Island |
Close up of kitchen lower cabinets |
In-Law-Suite kitchen |
Master bathroom cabinet and sink |
Upstairs bathroom cabinet and sink |
Doors + supplys |
Trim, moldings & other supplys |
Side Walk 4' wide & 45' long |
Drive Way 30' wide & 45' long |
The blue flags show the area for the septic tank |
Septic Field |
Septic Field |
We are moving right along.