Saturday, December 17, 2011

We Have Cabinets

12/15/2011 The cabinets were installed and the concrete was finished.
12/16/2011 The trim and doors were delivered and the septic field was prepped.


Kitchen

Kitchen

Kitchen

Close up of kitchen Island

Close up of kitchen lower cabinets


In-Law-Suite kitchen


Master bathroom cabinet and sink

Upstairs bathroom cabinet and sink


Doors + supplys

Trim, moldings & other supplys


Side Walk 4' wide & 45' long 

Drive Way 30' wide & 45' long

The blue flags show the area for the septic tank 

Septic Field

Septic Field
We are moving right along.