12/16/2011 The trim and doors were delivered and the septic field was prepped.
![]() |
| Kitchen |
![]() |
| Kitchen |
![]() |
| Kitchen |
![]() |
| Close up of kitchen Island |
![]() |
| Close up of kitchen lower cabinets |
![]() |
| In-Law-Suite kitchen |
![]() |
| Master bathroom cabinet and sink |
![]() |
| Upstairs bathroom cabinet and sink |
![]() |
| Doors + supplys |
![]() |
| Trim, moldings & other supplys |
![]() |
| Side Walk 4' wide & 45' long |
![]() |
| Drive Way 30' wide & 45' long |
![]() |
| The blue flags show the area for the septic tank |
![]() |
| Septic Field |
![]() |
| Septic Field |
We are moving right along.