I finished up with the new shade structure for the daycare kids. It wasn't to big of a job and the structure should last for many years to come.
 |
| I concreted in my foundation posts over the weekend and let them set |
 |
| I started out by putting up the joists with screws so I could get the measurements right |
 |
| Joists prepped for carriage bolt installation |
 |
| The carriage bolts, nuts and washers |
 |
| The carriage bolts were installed and I cut down the 4x4 posts to the same level as the 2x6's |
 |
| I installed 3 rows of cross joists with 2x4's and I laid out the 26" wide by 10' long pvc roofing panels and secured them in place. |
 |
| After 2 days the concrete had set pretty good and the dirt had settled so I tamped down the dirt and cleaned up around the posts. |
 |
| Tamped and cleaned posts areas |
 |
| All done (left view) |
 |
| All done (right view) |
 |
| Between the tree and the new building the playground has more shade than ever. |