Friday, November 11, 2011

Lots Finished

11/7/2011 & 11/8/2011 The HVAC people from Down East finished up and did hellova good job. Next Stop Electric rough in.

Daycare washroom vent

Downstairs air return

Other side of the downstairs air return

Gas stove vent

Gas Line

Dryer vent

In-Law-Suite air return

Gas stove vented to the outside

In-Law-Suite bathroom vent


Upstairs bathroom vent


Downstairs HVAC unit

Downstairs HVAC duct work

No comments:

Post a Comment