12/29/2011 The past few days have been a whirlwind. I'm just going to post lots of pics from the past few days.


Both AC Units are installed

The HVAC Control Units are in

The Attic Pulldown Steps are installed

The stair rails and steps are in

Shot of the daycare 1/2 bath with Sink, Toilet, Floor and all of the hardware installed

Shot of the In-Law-Suite bathroom with Everything installed

Shot of the upstairs bathroom with most things installed

All the lighting hardware and smoke alarms are installed

80 gal Hot Water Heater and Laundry Room sink are installed

Master Bathroom Tub + Hardware are installed

Master Bathroom Shower + Hardware are installed

Remote control Ceiling Fans with Lights are installed

I installed a under the cabinet kitchen dvd/radio/tv

In-Law-Suite flooring getting installed

Upstairs bathroom flooring installed

Trim Work is Complete

All the kitchen outlets, faucets, & dishwasher are installed

I installed mounts for all the wall hung tv's and the wall mount surroung sound speakers were installed

The Ceiling Surroung Sound Speakers were installed

The septic tank was connected to the house

The breaker box is completely wired and ready to be powered up

The Walk in closet lights are installed

The gas stove and vented hood are installed

The office floor is getting installed

The Daycare room floor is getting installed

The In-Law-Suite floor is in

The meter box and my outside subpanel box are wired up and ready to be powered up

The Foyer light is installed, and I installed the mount for the daycare tv

Island light is installed
We don't have much more to go. With the acception of the septic sensor being wired up (this should be done today) all the electric is done. The Ethernet outlets and the surround sound outlets are being finished today 12/29/2011. The septic field is being installed and backfilled today 12/29/2011. The hard wood flooring and carpet are being finished up today 12/29/2011. All the above items should be completed at least by 12/30/2011 in the morning. Touch ups and cleaning will be the last things done. Looks like early next week we should be in the new place.