| The house got power today 1/3/2012 |
![]() |
| The house got power today 1/3/2012 |
![]() |
| My son, my brother and I put together and installed the laundry room cabinets |
![]() |
| Laundry room cabinets open |
![]() |
| Delta Touch faucet got installed in the main kitchen |
![]() |
| Delta Touch faucet got installed in the in-law-suite |
![]() |
| I installed a baby changer and a couple of shelves. |
![]() |
| Mirrors and bathroom hardware got installed |
![]() |
| Shower doors almost installed |
![]() |
| The tile is in place |
![]() |
| All the closets got wire shelves installed. I'll be custom building the closet storage shelves after we move in. |
![]() |
| Carpet is installed upstairs, living room and all the bed rooms |
![]() |
| 3/8 wood flooring in the second daycare room |
![]() |
| 3/8 wood flooring in the first daycare room |
![]() |
| Septic sensor and alarm got wired |
![]() |
| Drain field got dug in |
![]() |
| 1st Layer of the installed drain field |
![]() |
| The septic tank is wired, connected, and installed |
![]() |
| For 2 days my kids and I have cleaned & racked out the yard tomorrow we seed, straw, & water. |
![]() |
| We have the seed and straw ready to go |